About the Scheme

Electronic Manufacturing Cluster (EMC) Scheme supports creation of world-class infrastructure for attracting investments in the Electronics Systems Design and Manufacturing (ESDM) Sector. EMCs scheme supports grant assistance for setting up of both Greenfield and Brownfield EMCs. The financial assistance under the scheme is in the form of grant-in-aid only. For Greenfield EMCs the assistance is 50% of the project cost subject to a ceiling of Rs. 50 crore for every 100 acres of land and for Brownfield EMCs the assistance is upto 75% of the project cost subject to a ceiling of Rs. 50 crores.

Status in MP

Ministry of Electronics and IT (MeitY) has accorded final approval to green field two EMCs in MP. The Proposed EMCs are at – Bhopal and Jabalpur.

Highlights of the Proposed EMC

  • BASIC DEVELOPMENT, ESSENTIAL & GOVT. REGULATORY SERVICES

(Boundary Wall, Internal Roads, Drainage and culverts, Footpaths and Pathways, Retaining Walls, Cutting Filling and Consolidation, Sewage Network Septic Tank, Water Supply, Horticulture and Landscaping, Park development, Power Supply, DG Sets, Administration Block)

  • MANUFACTURING SUPPORT FACILITIES

(Testing & Calibration Centre, R&D EMI/EMC, CAD / Cam Design House/Plastic Moulding/Sheet Metal Stamping/Tool Room etc.)

  • OTHER SUPPORT FACILITIES

(Trade Pavilions with Centralised AC Facility, Telecom / IT Infrastructure & Video Conferencing)

  • WELFARE FACILITIES

(Local Shopping Centre, Restaurants, Canteen, Horticulture and Landscaping, Park development, ATMs.)

 

BHOPAL ELECTRONICS MANUFACTURING PARK

Location of EMC

Badwai, District Bhopal, Madhya Pradesh

Site Connectivity
  • Road : NH-12 Bhopal – Jabalpur is adjacent to the land.
  • Rail : Bhopal being in the central zone of Indian Railways, all major trains pass though the city including Rajdhani/Shatabdi Express. Distance from the main railway station Bhopal- 12 Km.
  • Air: Daily flight to Mumbai/Delhi/Gwalior/Jabalpur/Indore/Khajuraho and connecting flights to major cities. Distance from the Bhopal International Airport-3 Km.
  • ICD : Inland Container Depot is situated at Mandideep, Distt. Raisen. Distance 40 Km. This site is located within the boundry of Bhopal development authority.
BoD of Company

Board Of Directors Of Company 

  • Mr. Nand Kumarum
  • Mr. Frank Noble A
  • Mr. Buddhesh Kumar Vaidhya
  • Mr. Sanjay Varma
  • Mr. Mitesh Lokwani
  • Mrs. Sadhana Kapoor
  • Mr. Kamal K Kori (COO)
Area of EMC

50 Acres (Pocessing area - 46.00 Acre; Non-processing area - 4.00 Acre)

Plotted Area for Units

32.74 Acres

Estimated Cost

Rs. 46.16 Crore

GoI- Final Approval

25th August 2014

Break-up of Project

Project Components

Amt. (In Cr.)
Basic Development (Road, Retaining wall, Cutting, filling & Consolidation, Drainage, Footpath, Sewage, Water, Horticulture, Power supply, Administration Block & Escolation etc.) 26.08
Manufacturing Support Services (Building cost, Equipment cost & Escolation etc.) 10.65
Other support facilities (Trade Pavilions & Escolation etc.) 3.76
Walfare facilities (Local Shoping Centre, Horticulture and Escolation etc.) 2.19
Consultancy & Supervision charges 2.13
Admin Expanses 1.35
Total 46.16
Means of Finance
Project Components

Amt. (In Cr.)

Central Grant 20.86
Contribution by State Govt. 8.11
Contribution form cluster enterprises/units 12.09
Contribution from MPSEDC (for the shortfall in grant assistance determined during appraisal) 5.10
Total 46.16
Sector Identified for EMC

ESDM (Telecom and IT Hardware)

Land Possession

The extent of the proposed EMC is 50 Acres. The land is owned by Dept. of IT, GoI of M.P

Layout Approved

Approved by T/C P Department

Land Allotment

Application for land allotment is being considered.

Land Premium

Rs. 16.20 Lakh per Acre

Development Cost

Rs. 21.78 Lakh per Acre

 

JABALPUR ELECTRONICS MANUFACTURING PARK

Location of EMC

Village Purva, Dist. Jabalpur, Madhya Pradesh

Site Connectivity
  • Road : NH-7 (connecting Bangalore-Kanyakumari) is adjacent to the site and is 8 Kms       from the main bus-stand.
  • Rail : Distance of the site from the main railway station is 11 Km.
  • Air : Daily flight to Delhi/Gwalior/Indore/Bhopal/Khajuraho and connecting flights to major cities. Distance of the site from the Airport is 24 Km.
  • Inland Container Depot (ICD) : The nearest ICD is situated at Nagpur (Maharashtra) at a distance 270 Km and at Mandideep, Distt. Raisen (M.P.) at a distance of 280 Km.
BoD of Company

Board Of Directors Of Company 

  • Mr. Nand Kumarum
  • Mr. FranK Noble A
  • Mr. Buddhesh Kumar Vaidhya
  • Mr. Sanjay Varma
  • Mr. Vishal Jeswani
  • Mr. Rajesh Gupta
  • Mr. Chandresh P Veera
  • Mr. Satyajeet Choubey
  • Mr. Kamal K Kori (COO) 
Area of EMC

40 Acres (Processing area - 35.87 Acre; Non-processing area – 4.13 Acre)

Plotted Area for Units

20.85 Acre

Estimated Cost

Rs. 38.01 Crore

GoI- Final Approval

25th August 2014

Break-up of Project
Project Components Amt. (In Cr.)
Basic Development (Earth work, Hume Pipe Culvert, Retaining wall, Horticulture, Pathways, Road divider, Manufacturing support facilities Block, Plumbing, Electrical Infrastructure, DG Sets, Overhead Tank, Equipment cost & Escolation etc.) 33.28
Other support facilities (Trade Pavilions, Administration Block & Escolation etc.) 0.87
Welfare facilities (Local Shopping Centre, Horticulture and Escolation etc.) 1.00
Consultancy & Supervision charges 1.76
Admin Expanses 1.10
Total 38.01
Means of Finance
Project Components Amt. (In Cr.)
Central Grant 17.76
Contribution by State Govt. 6.45
Contribution from cluster enterprises/units 10.08
Contribution from MPSEDC (for the shortfall in grant assistance determined during appraisal) 3.72
Total 38.01
Sector Identified for EMC

ESDM (Solar and Industrial Electronics)

Land Possession

The extent of the proposed EMC is 40 Acres. The land is owned by Dept. of IT, Govt. of M.P.

Layout Approved

Approved by T.C P Department

Land Allotment

Application for land allotment is being considered.

Land Premium

Rs. 16.20 Lakh per Acre

Development Cost

Rs. 21.78 Lakh per Acre

 